| UKRAINETO IMPORT FROM THE UNITED STATES GRAIN TRANSPORATION, LOADING/UNLOADING AND STORAGE FACILITIES EQUIPMENT,FINANCED BYGOVN'T OF UKRAINE |
|
UKRAINE TO IMPORT FROM THE UNITED STATES GRAIN TRANSPORTATION, LOADING/UNLOADING AND STORAGE FACILITIES EQUIPMENT, FINANCED BYGOVN'T OF UKRAINE U.S.-Ukraine Business Council (USUBC), Wash, D.C., Mon, Sep 14, 2009 WASHINGTON, D.C. -- The U.S. Commercial Service at the U.S. Embassy in Ukraine has been approached by an Advisor to the Prime Minister of Ukraine with an large agribusiness project to import $200-300 dollars worth of grain transporation, handling and storage equipment made in the United States that would be financed under a sovereign guarantee of the Ukrainian Government. [1] PROJECT GOAL: To Build Grain Transportation, Loading/Unloading and Storage Facilities Throughout Ukraine. [2] PROJECT VALUE: USD 200-300 Million.
1.1. DRYERS SHOULD BE MOBILE. CAPACITY FROM 5 TO 35 MT/HOUR. IF MOBILE DRYERS ARE NOT AVAILABLE FOR REQUIRED HIGH CAPACITY DRYERS SUCH AS 25 MT/HOUR + MORE THEN PLEASE OFFER THE STANDARD DRYERS YOU HAVE. 1.2. ENERGY TO BE USED: NATURAL GAS OR DIESEL. 1.3. DRYERS SHOULD HAVE BASIC LOADING IN AND OUT LOADING EQUIPMENT SUCH AS CONVEYOR LOADING MACHINES, BELTS, INTAKE/OUTTAKE PITS FOR TRUCKS USE (IF AVAILABLE).
2.1. CAPACITY MORE THEN 29 m3. 2.2. LOADING OUT CAPACITY 3-5 MINUTES FOR THE WHOLE TRAILER. 2.3. OUTLOADING PIPE/BELT SHOULD BE WIDE ENOUGH AND NOT DAMAGE THE CORN. 2.3. SHOULD BE ABLE TO BE AGREGATED WITH 150 HOURSE POWER TRACTORS. 2.4. SHOULD HAVE ELECTRONIC WEIGHT BRIDGE TO MEASURE THE WEIGHT PLUS BE ABLE TO PROVIDE OUTPRINT OF THE QUANTITY LOADED AND DISCHARGED. 3.1. LOADING IN AND OUT MASCIINES SHOULD HAVE CAPACITY OF > 180-200MT/HOUR. 3.2. SHOULD BE ABLE TO BE AGREGATED WITH 80 HOURSE POWER TRACTORS. 3.3 EQUIPMENT PROVIDER SHOULD BE ABLE TO PROVIDE EITHER OWN OR BE ABLE TO PROVIDE SERVICE IN SUPPLYING UNDER SUB-CONTRACT THE GRAIN BAGS. 4.1. EACH SUPPLYER SHOULD PROVIDE DETAILED TECHNICAL CHARACTERISTICS OF THEIR EQIPMENT 4.2. EACH SUPPLIER SHOULD PROVIDE FIRST AND NON-BINDING PROPOSAL OF THE PRICES IMMEDIATELY 4.3. EACH SUPPLIER SHOULD PROVIDE MONTHLY SCHEDULE OF THE DELIVERY BASES CIF UKRANIAN BLACK SEA PORT. FIRST EQUIPMENT SHOULD BE DELIVERED BY LAST HALF OCTOBER 2009 AND SCHEDULED UNTIL MAY 2010. [5] UNITED STATES MADE EQUIPMENT ONLY: The entire project will feature U.S.-made equipment only. We already have a preliminary confirmation from the US EXIM for financing for this project. Please also copy Morgan Williams at the U.S.-Ukraine Business Council (USUBC):
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
. Ruben Beliaev, Senior Commercial Specialist LINK: http://www.usubc.org/UKRAINE-PM_LIST-OF-REQUIREMENTS_EQUIPMENT2.doc |
|||||||||||||||

















U.S.-Ukraine Business Council (USUBC), Wash, D.C., Mon, Sep 14, 2009


















